You are here: >About us >Work Packages >WP7- Trials

WP7, Trials

WP7 will deploy the integrated components from WP5 in the trial areas for demonstration. Afterwards a field trial will be run for four months in the demonstration areas so that an effective evaluation of the developed system can be done. Finally, there will be an evaluation of the trial results.